Thursday, July 23, 2020

City's Website Includes Rolling Ridge Construction Updates

Below is the link that will take you to the City's website that includes information about the current road repaving project on Rolling Ridge DR and the connecting courts. 

If you would like to receive email updates from the project's head engineer, Craig Ausen, feel free to send him your email address.  If you are already receiving his updates, there is no need to contact him uness you have questions or concerns. 

Craig can be reached at (262) 349-6516 or CAusen@waukesha-wi.gov

The link to the City's website:  https://waukesha-wi.gov/1926/2020-Resurfacing-Program


Saturday, July 11, 2020

City Project Engineer Announces Beginning of Rolling Ridge Repaving


From the City's Project Engineer for the Rolling Ridge Repaving Project:  


The City of Waukesha 2020 Resurfacing project will be kicking off next week (weather dependent). The contractor is planning on removing trees near the culvert ends and within the drainage easement area starting on Tuesday 7/14. Following the tree and shrub removal, the underground contractor Mid-City will begin the installation of the new box culverts. They plan on beginning with the crossing at University Drive and work West.

During this time Rolling Ridge Drive from STH 318 to University Drive will be closed to Local Traffic Only. Residents who live along Rolling Ridge Drive will be able to access their driveway during this time. The contractor is asking to try to avoid the area if they are working on a box culvert.

If you have any questions, please contact me at your convenience.

Thank you,

Craig Ausen, P.E.
Project Engineer
City of Waukesha – Engineering Division
130 Delafield St. Waukesha, WI 53188
O: (262) 524-3589
C: (262) 349-6516